Industrial heat exchanger exceptional transport Marraffa took care of the exceptional transport of a 263 ton industrial heat exchanger in the province of Cremona. Find out what we did. Read the article
34 m cycle-pedestrian walkaway heavy lifting The walkaway, weighing 45 tons, was assembled entirely with lifting points designed and created to be able to carry out the activity in a single operation. Read the article
Two reactors handling in Brindisi Marraffa took care of the exceptional handling of two 230 and 190 ton reactors in Brindisi, thanks to the use of SPMTs. Read the article
Transport and lifting of a 23 m tank The tank was transported from the Adelfia production plant to the Birra Peroni plant in Bari Read the article
Handling of a 57 ton transformer Lifting and positioning of a 57 ton transformer inside the electrical station in the province of Foggia. Read the article
Two double girder spans handling for the new HS/HC Verona-Padua section The metal structure, 80 m long and weighing 280 tons, were moved over a distance of about 400 m, each using two 10-axle Goldhofer SPMTs Read the article