110 ton transformer heavy transport and skidding
The route from Italy to Albania and the positioning of a 110 ton transformer
Transportation and placement of a transformer in Albania
Read the article
Transportation and placement of a transformer in Albania
Exceptional transport from the production plant in Filago to the commercial port of Ravenna
Lifting, moving, and positioning an industrial press in a switchboard manufacturing plant
Marraffa has successfully completed the exceptional transport and handling of a 78 ton cooker.
Marraffa took care of the lifting, handling and positioning of two pairs of electric generators and gas turbines with Hydraulic Gantry Cranes.
Marraffa took care of lifting three tanks inside the Cantine Due Palme plant in Cellino San Marco.