Transport and lifting of a 23 m tank The tank was transported from the Adelfia production plant to the Birra Peroni plant in Bari Read the article
Handling of a 57 ton transformer Lifting and positioning of a 57 ton transformer inside the electrical station in the province of Foggia. Read the article
Two double girder spans handling for the new HS/HC Verona-Padua section The metal structure, 80 m long and weighing 280 tons, were moved over a distance of about 400 m, each using two 10-axle Goldhofer SPMTs Read the article
Marraffa in the transport of the TBM for the Munich-Verona railway upgrade Transport of over 80 items for the assembly of the TBM at work for the continuation tunnel of the Brenner Base Tunnel for the upgrading of the Munich-Verona railway. Read the article
Transport, lifting and handling of three 68-ton reactors The Marraffa team at work in an activity that included transport, lifting, handling and installation Read the article
110 ton transformer heavy transport and skidding Transportation and placement of a transformer in Albania Read the article