Lifting and handling of a monolith of nuclear waste
The operations allowed the removal of a large concrete block
03/02/2020
The Marraffa team removed a 130-tonne concrete block buried 6.5 meters deep in Matera. The operations were completed in just six days of excavation, thanks to the use of large mobile cranes and self-propelled SPMT.